SCOOP: Architecture Modification & Interior design and Design tracking.
LOCATION: Shifa Hospital New Cairo. YEAR: 2023
DESCRIPTION:
The scope of work for the Catheterization Department covered 400 m² of architectural modifications and interior design. The design concept focused on optimizing space efficiency and functionality, with a layout that supports smooth patient flow, staff operations, and equipment integration. The project involved creating a modern, safe, and comfortable environment while adhering to medical standards.